LOTTE Chemical LAS PSV, Hydraulic etc. Calculation
Calculation
Author
SGC e-Tech / PIELDS
Date
2022-11-03 13:40
Views
791
Project Name : LOTTE Chemical LAS PSV, Hydraulic etc. Calculation
Client : SGC e-Tech / PIELDS
Location : Yeosu
Service : Process Calculation
Year of Completion : 2023
Total 23
No | Project Name | Client | Date | Votes | Views |
9 |
TEMC C1-Project Basic Engineering
TEMC / PIELDS
|
2024.04.26
|
Votes 0
|
Views 552
|
TEMC / PIELDS | 2024.04.26 | 0 | 552 |
8 |
SK Materials S3 Project Assistant
SGC e-Tech / PIELDS
|
2022.11.03
|
Votes 0
|
Views 841
|
SGC e-Tech / PIELDS | 2022.11.03 | 0 | 841 |
7 |
LOTTE Chemical ES-Project Package #4 FEED
Lotte E&C / PIELDS
|
2022.11.03
|
Votes 0
|
Views 1022
|
Lotte E&C / PIELDS | 2022.11.03 | 0 | 1022 |
6 |
KKPC R&D Center I-Material Conceptual Design
KKPC / PIELDS
|
2022.11.03
|
Votes 0
|
Views 830
|
KKPC / PIELDS | 2022.11.03 | 0 | 830 |
5 |
LOTTE Chemical LAS PSV, Hydraulic etc. Calculation
SGC e-Tech / PIELDS
|
2022.11.03
|
Votes 0
|
Views 791
|
SGC e-Tech / PIELDS | 2022.11.03 | 0 | 791 |
4 |
High Purity Cresol Project PSV Load Calculation
SGC e-Tech / PIELDS
|
2022.11.03
|
Votes 0
|
Views 756
|
SGC e-Tech / PIELDS | 2022.11.03 | 0 | 756 |
3 |
BTX Debottleneck Study Project
Hanwha TOTAL/PIELDS
|
2022.11.03
|
Votes 0
|
Views 920
|
Hanwha TOTAL/PIELDS | 2022.11.03 | 0 | 920 |